A RENEWED IMAGE
In Montajes Cancelas we renew the facilities, giving a facelift to the workshop, never losing the essence that has always characterized us.
In Montajes Cancelas we renew the facilities, giving a facelift to the workshop, never losing the essence that has always characterized us.
Proud of our participation in the tenth anniversary of the Naval Fair recognized among the top three in the world and satisfied with everything he has given us, allowing us.. Read more
After the spectacular maneuver of load of the nose Adelaide ‘ on the bed of support installed in the ‘ Blue Marlin ‘, it followed it of refloat of the.. Read more
Vigo Ship Repair will present the services of their partners in Break Bulk Europe Antwerp, Belgium from 14-16 May 2013 and Transport Logistic München, Germany from 4 to 7 June
The project ” Vigo Ship Repair ” is dedicated to stimulating and promoting in the exterior the port of Vigo as enclave of naval repair. Inside the politics of managerial.. Read more
In the current text of reform of the Fishing Common Politics, the need is gathered that the different members states adopt measures of promotion of an economic, social industry and.. Read more
Between October and December 2012 was performed to repair the hull and pipes in the ship LADY MARY belonging to the company ESPA-GAMBIA INTERNATIONAL LIMITED
The FARALLO UNO vessel (construction no.119), equipped with a liquid ice harvesting system, has been delivered to the assembly plant Cultipeix on 30 June 2006. This thus closes the research.. Read more
The ATZENETA DOS feeding vessel (construction no.117) for bass and bream farms was delivered to the assembly plant Cultipeix, second vessel in the research project begun with Botalo for the.. Read more