The FARALLO UNO vessel (construction no.119), equipped with a liquid ice harvesting system, has been delivered to the assembly plant Cultipeix on 30 June 2006. This thus closes the research cycle for this vessel that had began with the Botalo and the Atzeneta Dos, for work in farms of this sort, a farm work and maintenance vessel (Botalo), a feed vessel (Atzeneta Dos) and, lastly, a harvesting vessel. (Farallo Uno).
